Follett Educational Services

This 9,000-square-foot high tech data center, designed to house some 200 servers and operate as a centralized data hub for more than six Follett companies includes:

• Installation of overhead floor membrane
• Installation of raised access floor system
• Installation of N + 1 configuration for major mechanical and electrical infrastructure components
• Installation of dual fire suppression system which included gaseous system supplemented with pre-action, double interlocked, dry-pipe sprinkler system
• Installation of dedicated redundant AC electrical power service with a UPS system and 5,000 gallon back-up generator for 24×7 facility operation
• Installation of complex HVAC system comprising four 20-ton units
• 800A master switch board with automatic transfer switch (ATS) by-pass
• Hydrogen detection system with exhaust fan link
• Six (6) CRAC units (Liebert)
• Four (4) 150Kva UPS units with wet cell batteries
• Four (4) 400A PDU distribution cabinets
• Single tier cable ladder rack with Panduit cable management system
• Two (2) fiber hand holes for optional fiber service
• Tier 2 Data Center

Citadel National Construction Group

Contact

We’d Love to Chat

Sini accus explis sinumque nonseni magnam eariaer cieniet maioribus, natius. Itiat lam verepta debisin venihit la nos deris corepra testorest, aliquae prae seque et aut elest, aut porro blat eos velia veliquis doluptam lique vendae pliquaspis nectem inctissed ut re lic te et ea dolupta tiandebis imillitiassi Epratur sae mo enis qui omnitius,