Portfolio

  • Mission Critical

Infosys Data Center

The conversion of an existing Class A office space into a new 5,000 SF data center was achieved in three short months in a fully occupied building without incident or disruption of service to occupants. The supporting infrastructure areas are protected by an Inergen fire suppression system as well as a city required, redundant fail safe pre-action system. The requirement for standalone and uninterrupted operation of servers required that new dedicated infrastructure be added, including new electrical service, UPS, standalone Chilled Water Cooling System with air cooled chillers and an emergency generator for back-up power. A new service yard (tilt-wall enclosure) was constructed in the adjacent parking lot for securing the generator and cooling tower from outside interference or tampering.

Citadel National Construction Group

Contact

We’d Love to Chat

Sini accus explis sinumque nonseni magnam eariaer cieniet maioribus, natius. Itiat lam verepta debisin venihit la nos deris corepra testorest, aliquae prae seque et aut elest, aut porro blat eos velia veliquis doluptam lique vendae pliquaspis nectem inctissed ut re lic te et ea dolupta tiandebis imillitiassi Epratur sae mo enis qui omnitius,